Testing Connectors


I wired up the experimental module end. The wiring follows the FREMO Puko 2.0 standard with 4mm plugs and couplers on each end per rail and a pair of plugs for the center studs. The cables are supposed to be stored inside the module, held in place by wooden clothspins glued to the module.


Comments

Popular posts from this blog

Snoqualmie Falls Hydropower Museum

Sunday: Kandersteg