Posts

Showing posts from September, 2019

Evening Return

Image
SAN - SJC

La Mesa TT&TO, Day 2

Image
In the siding at Walong On the second day, I spent all day in "the hill pool" running trains up and down the hill between Mojave and Bakersfield, contrary to yesterday . TT&TO can make this challenging, but I'm getting the hang of it, and there was always time for chats with operators or other crew members. Approaching Caliente Selfie at Cliff Entering Bena At Magunden At Ilmon Holding the main at Cliff Helper in Cliff siding I had a great time. A big thank you to the members at La Mesa for hosting this event. Climbing the hill at Walong

Timetable and Train Order Ops at La Mesa: Day 1

Image
It's Timetable & Train Order operations weekend at the La Mesa Model Railroad in San Diego's Model Railroad Museum. I've been here in March and got hooked on running trains with TT & TO procedures on a really big layout. While the signature scenes of the layout are the climb from Caliente to the summit at Tehachapi and the famous loop, there's much more to the layout than what museum visitors usually notice. During job assignment in the morning I picked the Arvin switch job, which was not quite what I expected. The Arvin job serves half a dozen potato packing houses on the branch line to Digiorgio and Arvin south-east of Bakersfield. Over the course of the day and 3 departures from Bakersfield, I moved about 120 reefers, plus 10 express box cars in and out of the Arvin branch. When I got my clearance for the 11:30am departure, I also got a rather verbose order about what else is happening around me. Between runs to Arvin I worked as hostler in the ATSF Bakersfie...

Evening Trip

Image
SJC - SAN

Untergroeningen: Connecting to the Welztalbahn (6)

Image
This weekend I ran most active locomotives on the Welztalbahn over the complete Untergroeningen module with some freight cars and switched at least a few cars on each run in some sensible pattern to exercise tracks and turnouts. I placed the Raiffeisen warehouse on the spur in Untergroeningen to get a sense of scale for this arrangement. I think I can make the storage tower an inch taller. This spur and business are a freelanced addition to Untergroeningen to allow for more diverse traffic on this branch line. While I was testing, in many cases I found some bugs and as a side-effect also identified additional rolling stock that is finicky on the converted Peco turnouts, like DB 216 428, an older Maerklin model of a Glmmhs 57 box car, which turns out to be a good test case for how far to file the turnout guard rails. The to-do list for the next couple weeks: Tune remaining Peco turnouts Build shadow box for each Untergroeningen segment and install LED lighting Add power to turnouts That...

Freeform veggie rice with grilled Teriyaki Chicken

Image
This turned out to be surprisingly yummy. Fried rice with bell peppers, onions, eggs, and grilled chicken that I put into a Teriyaki marinade this morning. The family approved and will consume the leftovers tomorrow.

Plum Pie

Image
This cake is more similar to a pie than other cakes I've made before. The cookbook labeled it a "Mittwochskuchen" (Wednesday Cake) because it's so easy and quick to make. We had 3 pounds of plums that needed to be eaten, so what better way is there than to turn them into pie filling? While not pretty to look at on the plate, the result is deliciously plum'y.

Untergroeningen: Connecting to the Welztalbahn (5)

Image
Franziska helped me set up the modules tonight. They don't have proper feet yet, so for now I just clamped two boards to the side of the modules. However, this represents the first time that Untergroeningen is complete and connected with power to the Welztalbahn. Over the next couple days I will test various rolling stock with the new tracks. Once that is done, I'm planning to disassemble this setup and finish backdrop, turnout control, and segment lighting for Untergroeningen.

Untergroeningen: Connecting to the Welztalbahn (4)

Image
I've started testing the track work in Untergroeningen with rolling stock that I know is sensitive to non-ideal track, and borderline with regard to norms. Switching different kinds of cars helped with finding and partially resolving dead spots and shorts. The older Maerklin stock is really good at finding pukos that I put too close to the edge of the rail.

Untergroeningen: Shadow Box

Image
Untergroeningen will be located in the garage, at least for the time being. So I need a dust cover that is reasonably tight, easy to remove, reasonably stable, and easy to store. While thinking about this I realized I could just build a shadow box for the layout and close up the front, when it is not in use. The plan above shows the fairly standard design. It was important to me to make the box easy to disassemble, so just like with the modules I use bolts and wing nuts. No tools needed. In addition, the support structure cannot protrude more than 1 inch in the rear because of clearance issues behind the modules. Segment 1 became the prototype. I need a bigger workbench, the modules don't fit... Or maybe store less crap on the top of the workbench. Installing the backdrop. Test fit all the pieces before glueing. With the table saw I made 45 degree angle pieces from 3/4" plywood. That's where the LED strips go. Testing in the garage. I need two rows of LEDs to get sufficien...

Untergroeningen: Turnout Control

Image
Untergroeningen only has hand-thrown turnouts. I was considering to replicate this in my rendition and use turnout levels like the small ones from Caboose Industries. Feasible, but turnout motors are more convenient, so I installed Tortoise motors in all three segments of the station. No computer control is planned for this module, so the turnout motors are controlled with regular DPDT-switches, thus at least somewhat replicating the local control theme. The switches need to be installed in the module side, and can't stick out of the side of the module. This is where 3/4" sides come in handy, too. What I didn't quite settle on was how much space to leave around the switch, so I made a test with a scrap piece of plywood, and quickly settled on the 1 1/2" diameter hole. The family agreed. After carefully measuring the center points, drilling the holes freehand is fun and goes quickly. Next I glued scrap pieces of hardboard behind the holes and fixed up the paint. Once t...