SVL: Transitional Ops October
Silicon Valley Lines ran another operations session with remote operators and a socially distanced skeleton crew in the layout room. This time around the technology worked smoothly. The upgraded Internet connection performed well and we had sufficient bandwidth to run video conference sessions and Youtube Live stream in parallel. The screenshot above shows the cab view perspectives from passenger train 18 in Igo controlled by a club member in the UK as its getting passed by passenger train 111. High priority train 104 is holding in Jacksonville for train 18 to get moving again. Meanwhile train 102 is ready to depart in Windsor pending assignment of a remote operator. Two local operators took care of switching assignments. An on-site brakeman worked with remote operators to assist with easy switching chores, or if there were derailments. The Nowheres Yardmaster set up or broke down trains. I worked the A/V job and helped out with brakeman duties as necessary. I spent most of the ev...