Posts

Showing posts with the label trains

Der Tunnel - Verbindungsbahn der S-Bahn Stuttgart

Image
It's rare that railroad projects are documented in vast detail from the perspectives of civil engineering, economics, and social impact in a single book. "Der Tunnel" is one of the exceptions. It describes design and construction of the central element of the S-Bahn Stuttgart: The city tunnel between Hauptbahnhof (main station) and Schwabstrasse, and it's underground continuation to Vaihingen via Universität. In over 35 detail-loaded chapters the authors work through early plans and financing of the project, discuss in detail the various construction sites within the city core, including engineering challenges of constructing a tunnel in the middle of a bustling city with difficult geology. They keep the high level of detail as they discuss the concerns and engineering challenges building the Hasenbergtunnel towards Vahingen. Along the way they touch on such diverse topics as re-routing of sewers, tram lines, and car traffic; digging next to, or under, historic buildi...

ETE: Bay Area Module Group at Oakland Aviation Museum

Image
601 004 traveling across the Danish country side. Fast-forward 50 years: 442 206 crosses a bridge that could be located in the Black Forest. Today I hung out with the ETE Bay Area Module Group at the Oakland Aviation Museum. I even brought some trains with me. This was a great opportunity to run the BR 601 in Intercity service in its full length consist with 8 cars, which looked great running on the long main line loop the group has set up.  I had a lot of fun running trains, chatting with friends, and enjoying the atmosphere. The museum was quite empty, which was a pity since there's lots to see besides model trains, especially if you're into planes. I took a short video, too.

Roco 43012 - Preparing for an Outing

Image
 [ 601 posts ] I haven't worked on the BR 601 3-rail conversion project for almost 3 years now. I was stuck on a mechanical drive train problem, how to install lights, and how to power the sound decoder for the rear motor unit. In addition, the full train is too long for the Welztalbahn. So several intermediate cars stayed in the box, and a shortend train with the two power cars sat on a storage track in staging.  Now I  have an opportunity to run the train in its full-length glory on a larger layout in public, so I finished swapping all wheel sets for their respective AC counter parts and installed the hand rails at all doors. I'm not going to be able to finish installing the sound decoder in the second motor unit before Monday, nor lights or passengers. That will have to wait for another time. I hope that I can resolve the drive train problem today or tomorrow.

SVL: August Modern Ops Session

Image
For the first time in months, I was able to participate in an ops session at Silicon Valley Lines in person again. This was a nice opportunity to catch up with other club members and enjoy the atmosphere of being in the layout room. I ran Bayshore Yard, which was a very relaxed assignment with plenty of opportunities to railfan trains run by remote operators.

Delivery from Germany

Image
I have not been to Germany for a while, so various ebay orders have been piling up at my parent's place. This summer two of our children went to visit family, and they brought back a treasure trove of stuff. Lots of original paperwork from the 1970's, including schedule books, maps, and a Güterkursbuch from 1972. Various books and magazines about the Bundesbahn in the 70's, some original artifacts, and some history books about railroads in Württemberg. I also picked up a collection of original rules and regulations from the 1930's, 40's, and 50's. Lots of stuff to go through. I'm planning to post some of the more interesting original paperwork here over time. 

Untergroeningen Station Building (2)

Image
 [ Untergroeningen posts ] [ part 1 ] I've constructed the station building shown in part 1 in Tinkercad , which is a very easy to use online 3D CAD tool. I know it mostly as a tool for users that want to send the resulting model to a 3D printer. Tinkercad makes exact sizing of the model very easy. Measurements of elements are readily accessible, and changing values is trivial. Developing a 3D model from photos and drawings is interesting. Especially the roof geometry remained a challenge, though at last I finally figured out what the geometry actually must have looked like, based on how the roof lines develop from the walls and what I can deduce from photos taken at eye level from the ground.  I didn't want to 3D-print the station building, but rather wanted to build a paper model. Much more economical than springing for a 3D-printer and filament. There are many instructions and tools to unwrap 3D models. Dedicated payware like Pepakura (Windows only), Unwrap3D, plugins to ...

Untergroeningen Outbuilding - Completed

Image
 [ Untergroeningen posts ] [ part 10 ] The outbuilding is now completed. I added windows and added more weathering. This was a fun build and gave me confidence that I can tackle the larger challenge of scratchbuilding the main station building. If you want to read the whole story of constructing this outbuilding, start here .

Untergroeningen Station Building

Image
 [ Untergroeningen posts ] With the outbuilding mostly completed, I'm starting to work on the station building of Untergroeningen. I have photos. I have an aerial photo . What I don't have are reliable measurements. I made drawings and a mockup from paper, but I felt that the building proportions were not quite right. A couple days ago, I started constructing the building in 3D from the drawings I made earlier. The idea is to replicate viewing angles I have as a photo and see what the 3D model would look like. This is not perfect, since lens distortion and other optical effects get in the way, but I'm hoping to get closer. Here's me first try. Not too shabby, but the proportions are indeed not quite right. I think I might have made the building a bit too deep, but it's hard to tell on the screen. If only I could make a paper model from the STL 3D model ...

Untergroeningen Outbuilding (10)

Image
 [ Untergroeningen posts ] [ part 9 ] We're coming close to the end of this build. The Outbuilding is basically done. It's missing only the windows and the foundation. The windows will come when I have decided whether to scratch-build, kitbash, or 3D-print them. The foundation will be part of the final installation in the Untergroeningen module, so will come at a later time. Meanwhile, I have completed the garage doors, added the gable barge boards, a venting pipe, downspouts, and the concrete "Schamwand" in front of the restroom doors. That wall likely used to be made from wood way back when the restrooms were built, and replaced with a concrete wall as the old wooden wall was falling apart. I assume the building got a refresh in the early seventies. Hence, the relatively new roof and mostly spotless garage door, too.  None of the prototype photos I have show the outbuilding in the early seventies, so I took some artistic license here. [ finale ]

Untergroeningen Outbuilding (9)

Image
 [ Untergroeningen posts ] [ part 8 ] It's time for the roof. I cut the roof from a Kibri sheet, air brushed with a mix of red, yellow, and brown and accentuated with a alcohol / india ink wash. The gutters are from an old Auhagen roof details set. I made the peeling green paint effect on the gutter with an Aquarell pencil. The gutters are a bit too long and will need a new end piece fitted later.  I always have some trouble determining the proper length of roof pieces, and often cut the first piece a little bit too short. Getting this right on the first try is not really that hard, but I usually only notice it when I glue the piece to the building. So far I've always managed to mostly disguise my inability of cutting properly sized roofs. Once the gable barge boards are fitted, you won't be able to tell that one roof sheet is a bit taller to make up for the shortness of the other one. [ part 10 ]

Untergroeningen Outbuilding (8)

Image
 [ Untergroeningen posts ] [ part 7 ] With the base color done, it was time for some detailing. I don't have the right colors to faithfully replicate the colors of the prototype, but I was after a believable brick structure that has some life in it. I experimented with various different approaches on a test piece -- visible behind the outbuilding in the photo below -- and then settled on a technique using Aquarell pencils. I first highlight individual bricks using various Aquarell pencil colors. Of course, the bricks are pretty small, so I usually hit more than one brick at once, and also don't color all the bricks. That's ok. I'm after variety here. For the color palette I chose various dark orange, red, and yellowish tones, as well as gray and black.  Once the bricks are highlighted and the Aquarells are dry, I flood the mortar lines with an alcohol-based wash made from ModelMaster Flat Cement, plus a couple drops dishwashing liquid. I apply the wash with a fine bru...

Untergroeningen Outbuilding (7)

Image
 [ Untergroeningen posts ] [ part 6 ] It's amazing how buildings get transformed once you paint them. This afternoon I airbrushed the outbuilding with Vallejo ModelAir Mud Brown (71-037) as a base color matching the base color of the engine shed. Once that was dry, I brushed a first coat of leather brown on the timbers. The colors are not where I need them to be, but I really like how the paint brings out the texture and character of the building. The garage doors are missing, hence the feature-less area behind the guy. [ part 8 ]

The Welztalbahn in Layout Design Journal

Image
I'm thrilled to report that the current issue of Layout Design Journal (LDJ #69) comes with an article introducing the Welztalbahn, and describing my journey from idea through design to layout. Including many of the detours and compromises I made to turn the layout into reality.  Byron Henderson, the editor of LDJ, did a superb job turning my article and materials into an appealing presentation. This is my first published article that's exclusively about my own work. Of course, I could not have done this without the support of my family and friends that gave me feedback and encouragement along the way. Thank you!

Untergroeningen Outbuilding (6)

Image
 [ Untergroeningen posts ] [ part 5 ] It's time for doors! Making straight cuts and filing 90 degree angles is surprisingly hard when the opening to be worked is only 3 mm by 6 mm and every tool at your disposal seems too big. In the end I managed, but this is pushing boundaries for me both in fine motor skills and eye sight. The door arches are cut from a sheet from The N Scale Architect . The sheet comes with several different arch styles. The bricks of the one I picked felt too long in comparison to a prototype photo, so I cut a slightly narrower arch. I shortened the arches so that they fit over the doors and pinned them in place with CA, so that I can mark the outline with a sharp knife. This would have been much easier had I not assembled the building already (Stop whining, Bernhard, you mentioned that previously). I used a cut-off disk in the Dremel tool to cut away most of the wall that was in my way. This looks much worse than it really was. After more cutting and filing...

Untergroeningen Outbuilding (5)

Image
 [ Untergroeningen posts ] [ part 4 ] The rough openings for doors and windows are now done. Making these cuts with the assembled building is difficult and messy. I used a combination of tools to make the cuts and clean them up, including a Dremel with the cutoff disk, an Xacto knife, the nibbler, and various needle files. When I build the main station building I will try very hard to not assemble the wall sections until all windows and doors are cut and installed. It's so much easier to do this work when the wall section can be put on a flat surface... I cut all the windows from the top edge of the wall section. There's a wooden beam that runs along the top edge of the wall that will disguise the cut. The doors to the bathrooms will get a masonry arch that still needs to be cut, so the door height as is is lower than the final arrangement. That will be the next step in this project, and is a good exercise to prepare for building similar arches in the station building. Below ...

Untergroeningen Outbuilding (4)

Image
[ Untergroeningen posts ] [ part 3 ] With the core of the building done, I cut and applied styrene brick sheets to get the texture I need. These sheets are from The N-Scale Architect . Despite the name, the company makes the sheets in HO and O scales as well. This is English bond brick sheet, which technically is not quite accurate for my needs, but much closer to the brickwork pattern used in Untergroeningen than the American bond or Flemish bond patterns. The German Wikipedia page about brick patterns calls the English bond "Blockverband", while what I need for Untergroeningen would be "Kreuzverband". I have not been able to find the "Kreuzverband" pattern as brick sheet. Thankfully, the two patterns are very similar, and most people won't notice the difference anyways, so the sheets I have are an acceptable substitute. After laminating the brick sheet to the core, I continued with representing the timbers of the wooden support structure of the pr...

Untergroeningen Outbuilding (3)

Image
 [ Untergroeningen posts ] [ part 2 ] With the drawings done and checked, it's time to go to the workbench and pull out the styrene. I first had to take care of and clean up a couple other projects that collected dust there. Once that was out of the way, I started with building the core of the outbuilding. The NWSL True Sander is very useful to get the edges straight and at ninety degree angle. Working on a glass tile helps with keeping the pieces aligned. [ part 4 ]

Untergroeningen Outbuilding (2)

Image
 [ Untergroeningen posts ] [ part 1 ] I finished the outbuilding drawing from yesterday, made copies and built a paper mock-up to verify appearance and scale. The proportions are slightly off from the original, but close enough that I'm not going to worry about it. I like how the building is coming together. I tested placement on the module. When I compared the photo below to photos from the prototype, the placement is a bit too close to the station building. However, there's enough space on the module to move the outbuilding a bit further away and still have plenty of space for the wooden shed from the prototype. [ part 3 ]

Untergroeningen Outbuilding

Image
 [ Untergroeningen posts ] My next project is scratch-building the outbuilding at Untergroeningen station. As was common for lines built before and around the turn of the 19th century, the public restrooms were in a building separate from the main station building. In Untergroeningen, the building also includes what looks like a garage, or storage room. Vergessene Bahnen has several photos of the Untergroeningen station area and its author shared additional photos with me. Thank you, Herr Schruft! I'm using the photos to draw up plans for the building. The guiding idea here is to get the scale right in relation to the HO figure, and approximate the building outline and features as closely as possible. I have clear photos of three building sides. The right hand side is hidden in the shadows of the tree next to the building, so there's some guesswork involved. Next up is making copies of the drawings, putting together a paper prototype to put on the module, and checking scale i...